Monday, March 23, 2009




Bridge Building Assignment:


Design Problem and Design Brief
We had difficulties picking the right structure for the bridge. Also we tried to put as many triangle shapes as possible. Also we tried our bests to keep the bridge from twisting

Analysis
I was questioning how much the bridge would be able to hold because it was not completely level on the top and bottom.

Synthesis
I think that our bridge will hold over 100 to 200 lbs.
we haven’t put pressure to it yet so its an estimation.

Evaluation
I think we could of built our structure better to prevent it from twisting.


The Weigh In
Our bridge held 210 lbs. it broke quickly because with the structure that we chose it allowed the bridge to twist therefore breaking easily.

No comments:

Post a Comment